| ENERGY AND ENVIRONMENT PARTNERSHIP WITH CENTRAL AMERICA |
| PROJECTS STATUS |
| FEBRUARY - 2012 |
|
| No | Country |
Code | Project name |
Partners | Project description |
Status | Partnership (EUROS) |
| 1 |
Belize |
1.01 |
Revision and update of the feasibility study of a co-generation plant and evaluation of alternatives of generation with steam |
Belize Sugar Industries Ltd (BSI) / Electrowatt Ekonno |
Evaluation of technologies for the optimization of the use of the bagasse in the co-generation (22 MW) of the company Belize Sugar Industry (BSI). Revision of previous feasibility studies
|
(8) Finished |
€ 45000.00 |
| 2 |
Belize |
1.02 |
To update the Hydroelectric Potential of Belize |
Belize Electric Company Limited |
Update the hydroelectric resources potential and determine its technical and economic feasibility |
(8) Finished |
€ 62000.00 |
| 3 |
Belize |
1.03 |
Hybrid Energy System for Calabash Key |
Ministerio de Ambiente |
Install a hybrid energy system (Solar/Wind) in the Marine Studies Institute in Calabash Key, Belize |
(8) Finished |
€ 60000.00 |
| 4 |
Belize |
1.04 |
Renewable energy technologies for the Douglas D'Silva Forest Station, Mountain Pine Ridge |
Ministerio de Recursos Naturales y ambiente |
Install two hydraulic rams and a micro hydroelectric plant 50-80 kW in the Mountain Pine Ridge Forest station |
(8) Finished |
€ 70000.00 |
| 5 |
Belize |
1.05 |
Jatropha for Biodiesel |
Tropical studies and development foundation |
Study for Jatropha Curcas plantation and commercial handling and soil rehabilitation, using varieties of higher yield |
(8) Finished |
€ 40000.00 |
| 6 |
Belize |
1.06 |
Baldi Beacon Wind Park |
DOE/BEL |
Evaluate potential of wind energy resource in the area of Baldi Beacon, Belize |
(3) Funds Request |
€ 30000.00 |
| 7 |
Belize |
1.08 |
Electrification of the Marine Reserves Network (MRN) Headquarters in Belize |
Fisheries Department |
To upgrade the existing basic electrical generation system at five (5) marine reserves and establish two (2) at the two marine reserves that are lacking the infrastructure so that the MRN has reliable and efficient electricity. |
(9) Inactive |
€ 15000.00 |
| 8 |
Belize |
1.08 |
Electrification of the Marine Reserves Network (MRN) Headquarters in Belize |
Fisheries Department |
To upgrade the existing basic electrical generation system at five (5) marine reserves and establish two (2) at the two marine reserves that are lacking the infrastructure so that the MRN has reliable and efficient electricity. |
(9) Inactive |
€ 15000.00 |
| 9 |
Belize |
1.09 |
Improving the Electrification of the San Antonio Village Health Center to a Solar Clinic |
BELIZE DEVELOPMENT FOUNDATION |
Installation 10 solar panels with full accessories to generate the required energy to operate the health center.
|
(3) Funds Request |
€ 10000.00 |
| 10 |
Belize |
1.10 |
Solar Energy use to improve cacao quality post harvest for 10 rural communities in Southern Belize |
Toledo Cacao Growers Asociation |
Contribute to the social and economic development of southern farmers by ensuring that their product are of excellent quality while refraining from the use of fueled driers and resort to solar energy. Farmers benefit on the premium price being paid for quality |
(3) Funds Request |
€ 57592.00 |
| 11 |
Belize |
1.11 |
ntegrated Farms Systems - Swine Farmers Bio-digester Project in Belize |
Ministerio de Agricultura y Cooperativas |
Increase the farmer´s income by adopting and establishing 60 biodigesters on 60 farms to use the manure from the piggery to produce fuel (biogas) for cooking and lighting, especially where there is no electricity. |
(2) Projects in Revision |
€ 46153.00 |
| 12 |
Belize |
1.12 |
Waste Vegetable Oil for the production of Biodiesel in Beliz |
Departamento de Ambiente |
Establish a waste vegetable oil collection system and storage facility in Belize City. |
(2) Projects in Revision |
€ 40000.00 |
| 13 |
Belize |
1.13 |
Avoiding Greenhouse Gas Emissions while improving capacity for sustainable management operations at Half Moon Caye Natural Monument (HMCNM) through the use of renewable |
Belize Audubon Society |
install renewable energy power supply to support research and monitoring activities by utilizing a solar powered energy system that will meet the energy needs of staff and
researchers, and possibly other users, participating in the management of Half Moon. |
(4) Elaborating contract |
€ 37600.00 |
| 14 |
Belize |
1.14 |
Use of wind Energy for aquaculture |
Belize National Tilapia Small Growers |
Use of wind energy for ventilation of tilapia tanks |
(3) Funds Request |
€ 46153.00 |
| 15 |
Belize |
1.15 |
Renewable energy for Education and Livelihoods in the Maya Golden Landscape |
Yataxché Conservation Trust |
Provide solar power to villages in Toledo, Belize as a way to improve economic conditions and reduce environmental impacts |
(5) Contract in Signature |
€ 30769.00 |
| 16 |
Belize |
1.16 |
Expansion of the Rio Bravo solar system and installation of 25 solar units in the San Carlos village in northern Belize |
Programme for Belize |
Supply the energy needs of the Rio Bravo Conservation and Management Area and the energy needs of San Carlos Village, a remote community, using solar energy thereby reducing the emission of greenhouse gases and reducing dependence on diesel generation |
(3) Funds Request |
€ 107692.00 |
| 17 |
Belize |
1.17 |
Electrification with the use of solar and wind energy and for a new farm of aquaculture in the Sarteneja community |
Sarteneja Aquaculture and Development Association |
To establish a wind and Solar System for the electrification of a aquaculture farm |
(2) Projects in Revision |
€ 61538.00 |
| 18 |
Belize |
1.18 UE |
Delivery of reliable and efficient electricity to the remote villages of the south of Belize |
Plenty International (Belize) Limited |
Location, design and installation of Solar System for a villages |
(7) Under Execution |
€ 141672.00 |
| 19 |
Costa Rica |
2.01 |
Sustainable biomass and bioenergy, a guide for preparation of CDM projects |
Centro Agronómico de Investigación y Enseñanza (CATIE) |
Contribute to the strengthening of local capacities and increase the participation of projects of sustainable biomass and bio-energy in the Costa Rica?s energy projects portfolio, particularly in the context of the Clean Development Mechanism (CDM |
(8) Finished |
€ 75000.00 |
| 20 |
Costa Rica |
2.06 |
Biofuel production from micro algae |
Energías Biodegradables de Costa Rica S.A. |
Research and training for the biofuels production from micro alga. In order to carry out production of oil from micro alga project the knowledge about the processes of production and oil extraction of micro algae has to be improved in order to support its culture in Costa Rica. |
(8) Finished |
€ 30000.00 |
| 21 |
Costa Rica |
2.07 |
Electricity Generation from biogas in a pig farm |
COMCURE: Comisión para el ordenamiento y manejo de cuenca alta del río Reventazón |
Develop and implement a renewable energy project for the production of electricity from biogas from anaerobic decomposition of pig manure |
(8) Finished |
€ 36777.00 |
| 22 |
Costa Rica |
2.08 |
To design and build a biomass gasifier from coffe mill Coopedota R.L.for electricity generation . |
Coopedota |
Develop a gasification system for the electricity generation from agricultural and agro-industrial residues from coffee mill Coopedota |
(8) Finished |
€ 35000.00 |
| 23 |
Costa Rica |
2.1 |
Biodiesel production using agroforestry and other production systems with Jatropha Curcas in south Costa Rica |
ACICAFOC |
Establishment of Jatropha Curcas plantations in farms of four organizations under 3 modalities: agroforestry systems, pastureforestry systems and plantation |
(8) Finished |
€ 43000.00 |
| 24 |
Costa Rica |
2.11 |
Tila Wind Energy project |
TILAWIND CORPORATION S.A. |
Feasibility study to develop 20 MW TILAWIND I Wind Energy project |
(8) Finished |
€ 30000.00 |
| 25 |
Costa Rica |
2.12 |
Proposal to promote the crop of 40 hectares of Jatropha Curcas in the zone of Puriscal, to produce bio-fuels |
Cooperativa Agroindustrial y de Servicios Multiples de Puriscal R.L. |
The project promote the establishment of the Jatropha curcas in property of producers associated to the Cooperative in approximating of 40 hectares, for a total of 60 producers and its families, with the purpose of determining the productive potential of the Jatropha that allows to become a socioeconomic alternative. It is hoped to establish an average of 0,6 Has by property, being considered in a maximum of 1 has by property and a minimum of 0.5 hectares |
(7) Under Execution |
€ 40000.00 |
| 26 |
Costa Rica |
2.13 |
Energy efficiency promotion trhough capacity building |
Camara de Industrias de Costa Rica |
To promote a campaign and promotion of energy efficiency through capacity building and training |
(7) Under Execution |
€ 25000.00 |
| 27 |
Costa Rica |
2.14 |
Electricity production from dairy farms Dos Pinos |
ICE/ Dos Pinos |
To develop and to implement a renewable energy project that serves as model of an integral system of handling of residual waters, production of electricity with biogas, and organic liquid fertilizer production for a dairy farms
|
(8) Finished |
€ 57000.00 |
| 28 |
Costa Rica |
2.15 |
PV systems for isolated areas and schools |
Asociación para la Ciencia y la Educación Moral |
To install PV systems in schools and homes in the Talamanca Region, Costa Rica |
(8) Finished |
€ 20000.00 |
| 29 |
Costa Rica |
2.16 |
Los Angeles Wind Park |
Compañía Nacional de Fuerza y Luz |
To perform a feasibility study for the wind potential of Los Angeles area |
(5) Contract in Signature |
€ 69000.00 |
| 30 |
Costa Rica |
2.17 |
To generate electricity and organic fertilizers from dairy farms |
Instituto Costarricense de Electricidad (ICE) |
To design, construct and operate 4 biodigesters, total capacity of 127 m3 of biogas in 4 dairy farms |
(8) Finished |
€ 60000.00 |
| 31 |
Costa Rica |
2.18 |
TILAWIND CORPORATION S.A |
TILAWIND CORPORATION S.A |
Strengthen the technological capacities of the company Tilawind Corporation S.A. with the validation of the "due diligence" studies required by the institutions and the international banks and to put in operation the Wind Project TILAWIND I. |
(7) Under Execution |
€ 20000.00 |
| 32 |
Costa Rica |
2.20 |
Generation of electricity and organic fertilizer production from the anaerobic digestion of manure in a dairy farm. |
Finca Julieta |
Develop and implement of a renewable energy project in a milky farm as model of an integrated system for handling of residual waters, production of electricity using biogas, and organic liquid fertilizer production. |
(7) Under Execution |
€ 16338.00 |
| 33 |
Costa Rica |
2.21 |
Wind Measurement and Pre feasibility study for the Wind Project Quequer, Guatuso, Alajuela, Costa Rica |
Ochenta Veinte S.A. |
Wind Measurement and Pre feasibility study for the Wind Project Quequer, Guatuso, Alajuela, Costa Rica |
(7) Under Execution |
€ 42000.00 |
| 34 |
Costa Rica |
2.22 |
Certification and HAFC Technology Transfer for Costa Rica: Its impact on the Central Valley air quality and its impact on the fossil fuel savings ( Vehicular Transportation and Electrical Generación Sector). |
FEDESCA |
Certification and HAFC Technology Transfer for Costa Rica: Its impact on the Central Valley air quality and its impact on the fossil fuel savings ( Vehicular Transportation and Electrical Generación Sector). |
(5) Contract in Signature |
€ 30000.00 |
| 35 |
Costa Rica |
2.23 |
Project pilot for electricity generation using Solar Photovoltaic Systems to improve efficiency and sustainability of the agricultural and bovine productive system and in Cariari, Pococi, Costa Rica. |
AGROECO |
Project pilot for electricity generation using Solar Photovoltaic Systems to improve efficiency and sustainability of the agricultural and bovine productive system and in Cariari, Pococi, Costa Rica.
|
(7) Under Execution |
€ 30000.00 |
| 36 |
Costa Rica |
2.24 |
Implementation of Systems of Electrical Generation from Biogas Obtained By means of the Treatment of the Cerdaza that Generates the Property Farming (Pig) Pigs the Hill |
ICE |
To design and to install an anaerobic biodigestor (without presence of I oxygenate) for the production of Biogas as alternative energy source by means of the biological degradation of organic matter (you excrete |
(7) Under Execution |
€ 46153.00 |
| 37 |
Costa Rica |
2.25 |
Mini Hydroelectric Power station |
Cooperativa Caficultores de Dota |
Construction of a mini hydroelectric power station with the purpose of to supply with electrical current to the benefit of coffee of Coopedota |
(9) Inactive |
€ 53846.00 |
| 38 |
Costa Rica |
2.26 |
To design and to implement an efficient process and of low cost for the oil extraction, produced by microorganisms (microalgaes and microfungi), like raw material for the biodiesel production. |
Fundación Centro de Alta Tecnología |
To compare the yield of the systematized oil production from microorganisms, |
(7) Under Execution |
€ 38461.00 |
| 39 |
Costa Rica |
2.27 |
?Impelling the Renewable Energies: Systems of Solar Illumination in the Indigenous Territory of Talamanca, Costa Rica? |
Asociación para la Ciencia y la Educación Moral, ACEM |
To improve the traditional systems of illumination based on nonrenewable energies like the candles, canfín or kerosene, with systems of solar illumination and lights LED |
(7) Under Execution |
€ 38461.00 |
| 40 |
Costa Rica |
2.28 |
Advantage of thermal energy and organic installment by means of a biodigestor in the tourist property land of Carlos Vargas? |
Instituto Costarricense de Electricidad (ICE |
To develop and to implement a project of renewable energy from the biogas obtained in the anaerobic decomposition you excrete of them bovine |
(8) Finished |
€ 38461.00 |
| 41 |
Costa Rica |
2.29 |
Generation of electricity and organic installment by means of a biodigestor in the milk property the Ayotes in Tilaran |
Instituto Costarricense de Electricidad (ICE |
Generation of electricity from biogas product of the anaerobic digestion by means of a generator, to partially satisfy the demands of energy of the milk property Los Ayotes |
(3) Funds Request |
€ 26923.00 |
| 42 |
Costa Rica |
2.30 |
Technique and economic feasibility and technical design for projects of the generation of electricity from the biodigestion of organic remainders of the agro-industrial and cattle processes |
Instituto Costarricense de Electricidad |
To make a technical feasibility study for the generation of electrical energy from biogas obtained like product of the anaerobic treatment of residual waters |
(4) Elaborating contract |
€ 34615.00 |
| 43 |
Costa Rica |
2.31 |
Biodigestors in farms pig and cattle in the community Monte Rey, Cariari |
AGROECO |
Construction and preparation of six Biodigestors for production of Gas to cook and production of saw fertilizers in demonstrative property |
(2) Projects in Revision |
€ 13076.00 |
| 44 |
Costa Rica |
2.32 |
Solar energy for the drying and dehydrated of organic products in the ecological property Oro Verde Quintamani |
Oro Verde Quintamani |
To develop and to promote the use of solar of low cost and highly efficient energy for the drying and dehydrated of organic products in the ecological property Oro Verde Quintamani
|
(6) In transact - DAF |
€ 40000.00 |
| 45 |
Costa Rica |
2.33 |
Generation of energy from biogas obtained by means of the treatment of the organic matter of the remainder of the pineapple |
Grupo Pelón/ ICE |
To evaluate the potential of the resulting organic remainders of the harvest and processing of the pineapple for the production of biogas like renewable energy resources and other products like organic fertilizer |
(3) Funds Request |
€ 13076.00 |
| 46 |
El Salvador |
3.01 |
Design of a Trust Fund to Support Renewable Energies (SIFER) |
MINEC, MARN y Electrowatt Ekono |
Create a special fund to promote the use of the renewable energies, especially for small projects |
(8) Finished |
€ 90000.00 |
| 47 |
El Salvador |
3.02 |
Feasibility Study for 6 Small Hydro Power Plants Development in Cacahuatique Area, Torola Rive |
SABES |
Feasibility study to develop 6 hydroelectric minipower plants between the 50-70 kW |
(8) Finished |
€ 50000.00 |
| 48 |
El Salvador |
3.03 |
Feasibility Study for the Energy Self-sufficient supply in the coffee processing industry, Beneficio Atapasco, La Libertad, case |
CAFECO y ENPRIMA |
Identification of appropriate technologies in order to get self-sufficiency energy supply in coffee mill Atapasco (biomass and methane production) |
(8) Finished |
€ 50000.00 |
| 49 |
El Salvador |
3.04 |
Pilot Project for Water Solar Pumping in the Community La Barra, Metapán, El Salvador |
PNUD (Small Grant Programme) y ADESCOLAB |
The project consists of 10 micro- systems for irrigation, through water pumping with solar energy in the community La Barra, located in Tecomapa Town, Municipality of Metapán, in the western Department of Santa Ana. Metapán is one of the areas with major problems of drought at national level; most of the local people are farmers and/or fishermen, they cultivate in agricultural plots located in the lakeside of Güija Lake, producing basic grains and vegetables.
|
(8) Finished |
€ 25000.00 |
| 50 |
El Salvador |
3.06 |
Solar Pumping Equipment for the Rural Community Metalio. |
Fundación Tecleña pro Medio Ambiente (FUTECMA) |
Installation of a solar water pumping system for a community of 300 houses |
(8) Finished |
€ 23000.00 |
| 51 |
El Salvador |
3.07 |
Wind Study for Energy Generation in El Salvador |
CEL |
1o. stage: To evaluate the wind potential for the electric generation in four sites. To determine trough the installation of wind measurement stations, and analysis of the registry of data, the areas with greater availability of wind resource in the country.
2o. stage: To make additional measurements in the 2 more promissory sites (Metapan and Armenia)
|
(8) Finished |
€ 80000.00 |
| 52 |
El Salvador |
3.08 |
Solar energy system for pumping potable water for one community in San Alejo |
ADESGOLFO |
Provide La Guacamayera Community with a reliable and low electricity cost potable water system by implementing a solar water pumping system. The system will supply water to more than 904 inhabitants of La Guacamayer Community. |
(8) Finished |
€ 30000.00 |
| 53 |
El Salvador |
3.1 |
Miravalle Bioelectric Power Plant |
ECO Energía/Hacienda Miralvalle |
Design and implement an anaerobic fermentation process for the production of biogas. Two-110 m3 capacity biodigestors will be built. They will process daily 4.5 m3 of manure. It is expected to generate 14 kWh/day for both the farm consumption and the surplus injected into the grid.
The project is located in Canton El Rosario, in the Municipality El Porvenir, department of Santa Ana, 80 km West from San Salvador |
(8) Finished |
€ 40000.00 |
| 54 |
El Salvador |
3.11 |
Use of Biogas from manure in three pig farms for electricity generation |
Granja Hermanos Jovel |
Design and construct of biodigestors to generate biogas from dung in three pig farms. The methane (CH4) will be used in internal combustion engine to generate electricity and reduce energy demand in the participants farms |
(8) Finished |
€ 30000.00 |
| 55 |
El Salvador |
3.14 |
To produce charcoal from forests pruning activities in El Salvador |
Rodolfo Guillén Hernández |
Develop, design and build a furnace to produce charcoal in El Salvador, through technology transfer between countries. The project will be implemented in Hacienda Jalponga, located in the jurisdiction of Santiago Nonualco, department of La Paz, El Salvador, to 50 km to the Southeastern of San Salvador, where the project developer has diversified the crops and is changing the sugar cane for more productive plantation trees. |
(8) Finished |
€ 15761.00 |
| 56 |
El Salvador |
3.15 |
To install around 250 ecostoves in communities of Metalio, El Salvador |
Fundación Tecleña pro Medio Ambiente (FUTECMA) |
Construction of 250 firewood burning Justa Model cook stoves. The beneficiary communities are: Taquillo, La Vega, Hermosa Provincia, La Pedrera, El Carrizo, Comaesland, Metayo y El Socorro, Jicalapa y Chiltuipan Municipality, Departament of La Libertad, El Salvador |
(8) Finished |
€ 25000.00 |
| 57 |
El Salvador |
3.16 |
Feasibility study and equipment installation to produce pellets from coffee pulp |
CAFECO |
Develop a feasible methodology for the use of coffee pulp (coffee peel) as a renewable energy source to meet the thermal energy demand that the Atapasco coffee mill needs for the coffee processing campaign |
(8) Finished |
€ 18285.00 |
| 58 |
El Salvador |
3.18 |
Solar heating water system for the Retire Home Dr. Ignacion Díaz Sol y Divina Providencia Hospital in San Salvador |
Ciudadela Dr. Ignacio Díaz Sol y Hospital Divina Providencia |
To install solar heating (thermal collectors) for hot water in certain areas of the nursey home of Dr. Ignacio Diaz Sol and the hospital Divina Providencia. At the same time demonstrate the use of clean energy for the hot water production with the intention to interest and stimulate other users to use the same technology. |
(8) Finished |
€ 30000.00 |
| 59 |
El Salvador |
3.21 |
Rehabilitation of CECSA's small hydro plants |
Compañía Eléctrica Cucumacayán S.A. de C.V. (CECSA) con la asistencia técnica de PÖYRY |
Refurbishment study for three small hydroelectric power stations: Cucumacayán, Milingo and San Luis II |
(8) Finished |
€ 33700.00 |
| 60 |
El Salvador |
3.22 |
Feasibility studies for five mini hidro power units in Morazán, San Miguel y Ahuachapán |
SABES |
Elaborate 5 feasibility studies to evaluate the technical and economic viability to construct 5 micro hydroelectric power plants in isolated areas |
(8) Finished |
€ 40000.00 |
| 61 |
El Salvador |
3.23 |
Competitivity development of of small entrepeneures of the carpenters sector in Nahuizalco, Sonsonate |
Centro de Desarrollo Artesanal (CEDART) |
Strengthening local carpenters production through a furnace for wood drying using renewable energy |
(8) Finished |
€ 30000.00 |
| 62 |
El Salvador |
3.25 |
Establishment of Jatropha Curcas from direct sowing of seed for the bio oil production |
Fundación Empresa y Desarrollo |
Sowing and development of 35 hectares of Jatropha Curcas (tempate) and castor oil (higuerillo) plantations in the Flor de Chilamate Community environs, for the oil extraction and production of biodiesel
|
(8) Finished |
€ 30000.00 |
| 63 |
El Salvador |
3.27 |
Jatropha Plantations |
ASOCIACION AGROPECUARIA ATLACATL DE EL SALVADOR DE R.L. |
To develop jatropha plantations among cooperatives and small producers in San Miguel, El Salvador |
(8) Finished |
€ 25000.00 |
| 64 |
El Salvador |
3.28 |
Hydro power in water distribution systems |
ANDA |
To design and construct two hydro power systems in the water distribution channels of ANDA |
(7) Under Execution |
€ 34000.00 |
| 65 |
El Salvador |
3.30 |
Construction of La Joya mini hydro, La Joya, Morazán |
SABES |
To build La Joya Mini-Hydro and to supply energy in the area |
(8) Finished |
€ 33333.00 |
| 66 |
El Salvador |
3.31 |
Construction of a Mini hydro power in San José Cureña, J/ Torola ; en el departamento de Morazán. |
SABES |
To build a mini hydro power in San Jose Cureña including its transmission-distribution grid |
(2) Projects in Revision |
€ 33333.00 |
| 67 |
El Salvador |
3.32 |
Construction of the mini hydro power El Salto J/Jujutla ; en el departamento de Ahuachapan. |
SABES |
To build the mini hydro power El Naranjito en el Beneficio El Salto |
(4) Elaborating contract |
€ 33333.00 |
| 68 |
El Salvador |
3.33 |
Prefeasibbility study for the project Reactivation of the Hydroelectric Dam Venecia Prusia. |
Compañía Eléctrica Jorge Meléndez e Hijos |
Complete the technical studies necessary to make the pre-feasibility of the project Reactivation the hydroelectric dam Venice Prusia which counts with an important existing infrastructure to reinitiate operations to generate electricity in the short term. |
(8) Finished |
€ 50000.00 |
| 69 |
El Salvador |
3.34 |
Study and proposal for the regulatory framework for renewable energy promotion in El Salvador |
Consejo Nacional de Energía |
Study and proposal for the regulatory framework for renewable energy promotion in El Salvador. |
(8) Finished |
€ 40000.00 |
| 70 |
El Salvador |
3.35 |
Generation of energy and bioabono using the remainders produced in the slaughter of birds of Planta de Proceso de Avícola Campestre S.A. de C.V. and the excrete of the Farming bovine cattle La Laguna. |
AVICOLA CAMPESTRE S.A. de C.V. |
Generation of energy and bioabono using the remainders produced in the slaughter of birds of Planta de Proceso de Avícola Campestre S.A. de C.V. and the excrete of the Farming bovine cattle La Laguna. |
(7) Under Execution |
€ 55000.00 |
| 71 |
El Salvador |
3.36 |
Installation of connected Photovoltaic System to the power network electrical network, in Sport Complex the Cafetalon of the city of Santa Tecla, the Freedom, El Salvador, C.A. |
Alcaldía Municipal de Santa Tecla |
Installation of connected Photovoltaic System to the power network electrical network, in Sport Complex the Cafetalon of the city of Santa Tecla, the Freedom, El Salvador, C.A. |
(9) Inactive |
€ 45000.00 |
| 72 |
El Salvador |
3.37 |
Evaluation of the Technical and Economic Feasibility of a System of Generation of Electricity from the Biogas Produced in Three Pig Farms in El Salvador |
Granjita San José, Jovel- Progreso |
To install a generating motorcycle for the production of electricity of the farms and to be realized technical and economic study of this installation |
(8) Finished |
€ 41538.00 |
| 73 |
El Salvador |
3.38 |
FEASIBILITY STUDY OF THE PROJECT OF REHABILITATION OF THE HYDROELECTRIC POWER STATION SANTA EMILIA |
AGROUNION, S.A de C.V |
to rehabilitate the hydroelectric power station down Santa Emilia I and approximately 2,6 kilometers waters, to construct to the hydroelectric power station Santa Emilia II, with which altogether an installed capacity of 1.180 KW would be obtained. |
(9) Inactive |
€ 30000.00 |
| 74 |
El Salvador |
3.39 |
PROJECT BRIQUET PRODUCTION |
Eco Flama de El Salvador |
To make the necessary equipment for generating the heat briquet production, from biomass, from paper, originating cardboard and sawdust of the remainders |
(7) Under Execution |
€ 19230.00 |
| 75 |
El Salvador |
3.40 |
AUTOSUSTENTABLE PLANT OF ANAEROBIC TREATMENT IN RIVER ACELHUATE, WITH GENERATION OF BIOGAS, ELECTRICITY AND ORGANIC INSTALLMENT |
CEL |
to determine the viability to construct a PLANT AUTOSUSTENTABLE OF ANAEROBIC TREATMENT IN RIVER ACELHUATE, WITH GENERATION OF BIOGAS, ELECTRICITY AND ORGANIC INSTALLMENT |
(2) Projects in Revision |
€ 100000.00 |
| 76 |
El Salvador |
3.41 |
Extension of the solar collector system of water heating for the Ciudadela Julio Ignacio Diaz Sol |
B1OO Arquitectos/Ciudadela ignacion Diaz sol |
To extend the solar system of water heating, to provide hot water to the dormitories and clinic of the home of old people |
(2) Projects in Revision |
€ 17756.00 |
| 77 |
El Salvador |
3.42 |
Furnace for the drying of wood in the Cooperative El Renacer, Chalatenango |
ACOPROARTE EL RENACER CHALATECO DE R.L |
To increase the ACOPROARTE competitiveness, through the application of the thermal solar energy in the process of wood drying |
(3) Funds Request |
€ 26923.00 |
| 78 |
El Salvador |
3.43 |
Movable units cooled with system of photovoltaic energy and processing of salty dry fish with solar application of energy in the Cooperative El Pargo |
CONAMUS |
Fishing product refrigeration |
(2) Projects in Revision |
€ 60384.00 |
| 79 |
El Salvador |
3.44 |
Thermal Solar System for Water Heating of the Process of Hydrotherapies of the National Hospital Regional San Juan de Dios |
Hospital Nacional Regional ?San Juan de Dios? de Santa Ana/ AGIC?AG International Consulting Group |
Implementation of a Thermal Solar System for Water Heating of the Process of Hydrotherapies of children and adults s in the Departments of Podiatry and Physiotherapy of the Hospital San Juan de Dios |
(4) Elaborating contract |
€ 72538.00 |
| 80 |
El Salvador |
3.45 |
Energy audit to determine the technical and economic feasibility of projects of power efficiency in the hospital San Juan de Dios |
ospital Nacional Regional ?San Juan de Dios? de Santa Ana/ AGIC?AG International Consulting Group |
To develop a energy audit to determine the technical and economic feasibility of projects of energy efficiency in the hospital San Juan de Dios |
(1) Projects in Formulation |
€ 23076.00 |
| 81 |
El Salvador |
3.46 UE |
Potential of the biomass like energy resources in the zone of the Jiquilisco Bay |
Universidad Centroamericana Jose Simeon Cañas (UCA) |
To determine the different agro-industrial remainders that they take place in the zone of the Jiquilisco bay that presents characteristic for the use of alternative energy sources, determining to them the potential of conversion of the biomass for the communities of the zone, specifically in the cooperative shrimp fishers |
(7) Under Execution |
€ 111754.00 |
| 82 |
Guatemala |
4.01 |
Promotion of the Biomass Energy Efficient Use |
Ministerio de Ambiente y Recursos Naturales (MARN) |
Strength and promote the efficient use of biomass energy resources by the establishment of nursery and forests with native species and saving firewood by using improved cook stoves in the rural area of the departments of San Marcos and Chiquimula , located in the north east and the south west of Guatemala. |
(8) Finished |
€ 70000.00 |
| 83 |
Guatemala |
4.02 |
Biodiesel production from Jatropha Curcas plantations |
Octagón S.A. |
Feasibility study and planting the first experimental plots for the industrial production of Biodiesel |
(8) Finished |
€ 90000.00 |
| 84 |
Guatemala |
4.03 |
Feasibility Study for the Sustainable Biomass Use in the Peten Itza Lake Basin |
Gremial Forestal de Guatemala |
Study to gather information about the availability, quality and prices of the biomass based on wood that does not have a commercial value in the wood industry and could be used for energy purposes. The study will indicate theoretically the technical options to generate electricity based on i) the availability of fuel, quality and prices, II) Power generation plants alternatives considering size and investment costs. |
(8) Finished |
€ 70000.00 |
| 85 |
Guatemala |
4.05 |
Electrification in Isolated Communities Related with Protected Areas |
NRECA |
Electrification for 115 homes in isolated protected areas. |
(8) Finished |
€ 90000.00 |
| 86 |
Guatemala |
4.06 |
Feasibility Study for the Wind Project Buenos Aires |
EEBA/WinWind |
To support the elaboration of the final version of the feasibility study for this wind power plant for 15 MW generation. |
(8) Finished |
€ 47000.00 |
| 87 |
Guatemala |
4.08 |
Feasibility study for a Hydroelectric project "La Esmeralda" |
Hidroeléctrica La Esmeralda |
Formulate the feasibility study for the develop of the hidroelectric project La Esmeralda, in the basin of the River Cucanjá, Alta Verapaz; for the production of electricity. Preliminary data provide a power potential of 12.5 MW. |
(8) Finished |
€ 63750.00 |
| 88 |
Guatemala |
4.09 |
Production of Dry Fruits and Vegetables with Geothermal Energy |
Agroindustrias La Laguna, S.A |
To establish an agro-industrial plant of dry fruits and vegetables with geothermal energy. The project tries to give an impulse to a system that has already proven and that has worked by more of 7 years in artisan form, and to turn in a model industrial plant with the capacity to fulfill requirements of greater production. |
(8) Finished |
€ 60000.00 |
| 89 |
Guatemala |
4.1 |
Energy generation from biomass in the South coast of Guatemala |
Pilones de Antigua/Asociación de Silvicultores de Guatemala / INAB |
To perform a feasibility study of a Power plant using energy forests, with a potential capacity of 9 MW |
(8) Finished |
€ 35000.00 |
| 90 |
Guatemala |
4.11 |
Commercial expansion of Jatropha curcas plantations for biodiesel production |
OCTAGON S.A |
To plant at 45 ha of Jatropha curcas in farmlands of Sayaxché, Petén |
(8) Finished |
€ 95000.00 |
| 91 |
Guatemala |
4.12 |
Biodiesel plant |
Octagon |
To construct a biodiesel plant with a capacity of 60000 gal/month (225,000 l/month) with local technology |
(8) Finished |
€ 20000.00 |
| 92 |
Guatemala |
4.14 |
Pre-feasibility study for the Hydro La Vega |
IEXCOM, S.A. |
Feasibility study for a 3 MW power hydro plant La Vega, located on the river Nahuatan, in the property ? La Vega? , in the Municipality of Pajapita, Department of San Marcos, Republic of Guatemala |
(8) Finished |
€ 50000.00 |
| 93 |
Guatemala |
4.16 |
The usage of geothermal energy in the process of producing biodiesel |
Biocombustibles de Guatemala |
To design and construct a heat exchanger and use the local geothermal energy to heat the vegetable and animal oils for the biodiesel process |
(8) Finished |
€ 20000.00 |
| 94 |
Guatemala |
4.17 |
Feasibility study for the installation of the OLADE's sub regional Office |
Dirección General de Energía |
To perform a feasibility study for the creation of OLADE's office for the central american region in Guatemala |
(8) Finished |
€ 10507.00 |
| 95 |
Guatemala |
4.19 |
Feasibility study for La Perla hydro |
Hidrosacpur S.A. |
To perform a feasibility study for La Perla hydro project, estimated 4.8 MW |
(8) Finished |
€ 40000.00 |
| 96 |
Guatemala |
4.21 |
Air quality monitoring in Guatemala city |
MARN |
To install automated monitoring stations in critical points of the city |
(7) Under Execution |
€ 25000.00 |
| 97 |
Guatemala |
4.23 |
Solar Technology in the Dehydrating Plant for Vegetables and Fruits ?Alimentos Campestre, S.A.?, Guatemala |
Alimentos Campestres S.A. |
The project consists in reconverting the dehydration plant of fruits and vegetables, located in the Department of El Progreso, Guatemala; through the use of solar energy as renewable resource. They have installed an Austrian design for a solar panels area of 384 Mt² |
(8) Finished |
€ 70000.00 |
| 98 |
Guatemala |
4.24 |
Solar heating for isolated health centers |
Ministerio de Energía y Minas (MEM) |
To install solar collectors for water heating in isolated areas |
(8) Finished |
€ 40000.00 |
| 99 |
Guatemala |
4.25 |
Renewable energies using forest, coffee residues and other biomass byproducts for producing energy |
Inversiones y Servicios Utatlán, S.A |
To assess the biomass potential and hydro resources for energy generation and run a saw mill |
(8) Finished |
€ 25000.00 |
| 100 |
Guatemala |
4.26 |
Solid Waste project in Antigua Guatemala |
Comercial Alvarado |
To perform a feasibility study for installing a solid waste treatment and energy generation in Antigua Guatemala |
(8) Finished |
€ 40000.00 |
| 101 |
Guatemala |
4.28 |
Hidro Power "Los Cerros" |
Energía Nacional, S.A. |
Refurbishment and upgrade of 3 MW Hydroelectric power plant Los Cerros, located at on the Ixlamá River, one kilometer away from San José El Rodeo municipality, San Marcos department. |
(8) Finished |
€ 50000.00 |
| 102 |
Guatemala |
4.29 |
Integration of Fishery (Tilapia) - Biodiesel production system in rural-community area |
TechnoServe |
To develop a pilot project for establisihing 4 fish ponds (capacity of 10,000 fishes each) and the establishment of 20 ha of Jatropha; the biodiesel will be used for pumping water in the fish ponds and the plantations. |
(7) Under Execution |
€ 30000.00 |
| 103 |
Guatemala |
4.3 |
Feasibility studies for wind sites in Guatemala |
Dirección General de Energía/Pöyry |
To asess the feasibility (technical and economics) of 4 sites in Guatemala where wind measurement towers have been installed and gathering data is under way. |
(8) Finished |
€ 45000.00 |
| 104 |
Guatemala |
4.32 |
Energy Efficiency in government buildings, pilot project, Ministry of Energy and Mines |
Dirección General de Energía |
To develop an energy efficiency study in the main buildings of the Ministry of Energy and Mines and to design a saving plan through Energy Efficiency |
(8) Finished |
€ 15000.00 |
| 105 |
Guatemala |
4.33 |
Research for reaching maturity fruits of Jatropha at one time |
Biocombustibles de Guatemala S.A. |
To develop an agricultural process to increase blossoning and to get the jatropha fruits to reach the harvesting time at one time |
(8) Finished |
€ 50000.00 |
| 106 |
Guatemala |
4.35 |
Feasibility study for biomass fuels in El Rosario Coffee mill |
Benefio El Rosario |
To assess alternative biomass fuels for the process of drying coffe in the mill |
(8) Finished |
€ 15000.00 |
| 107 |
Guatemala |
4.37 |
Jatropha curcas plantations and biodiesel facilities |
PE71, S.A. |
To start a 40 ha plantation of Jatropha curcas, and to install a biodiesel facility |
(8) Finished |
€ 40000.00 |
| 108 |
Guatemala |
4.38 |
Biodigestor for a pig farm |
Cocode El Carrizal |
To build a biodigestor for energy production (thermal) in a pig farm (50 animals) |
(7) Under Execution |
€ 7000.00 |
| 109 |
Guatemala |
4.39 |
Geothermal energy generation (binary system) I Phase |
Mesón San Michkael, S.A |
Feasibility study and drilling an exploration/production well in the Amatitlán area |
(8) Finished |
€ 10000.00 |
| 110 |
Guatemala |
4.40 |
Wind Bless Energy Project |
EL AMATE, S.A. |
Establishment of an anemometric tower to measure the wind speed at least during a year, this project will be support with the funds already designated to the Regional Coordination Office |
(8) Finished |
€ 25162.00 |
| 111 |
Guatemala |
4.42 |
Solar pumping system for fishery |
Asociación Nueva Santa Ana |
To install solar pv pumping system for a cooperative of tilapia producers in San Marcos, Guatemala |
(9) Inactive |
€ 25000.00 |
| 112 |
Guatemala |
4.43 |
Feasibility studies for el Camalote Hydro project |
Empresa Consultora Enrique De la Roca y Asociados |
To perform feasibility studies for El Camalote hydro power, in Petén, (8MW estimated) |
(8) Finished |
€ 75000.00 |
| 113 |
Guatemala |
4.44 |
Feasility study for a briquetting plant |
Recogua S.A/ Poyry Forest Industry Consulting |
To perform a feasibility study and bussiness plan for a briquetting plant in Guatemala |
(8) Finished |
€ 40000.00 |
| 114 |
Guatemala |
4.45 |
Biodigesters as mean of improving environmental conditions and quality of life in Sta. Apolonia, Tecpán, Chimaltenango |
Asociación Civil D.A.R |
To improve the quality of life of the families of Sta Apolonia by the construction of 100 low cost biodigestors and to reduce the pollution |
(7) Under Execution |
€ 50000.00 |
| 115 |
Guatemala |
4.46 |
Panzós Hydro Power, feasibility studies |
Corporación Bogavante, S.A. |
To elaborate feasibility studies for the Panzós Hydro Power |
(8) Finished |
€ 79503.00 |
| 116 |
Guatemala |
4.47 |
Feasibility study for the production of bioenergy in the Amatitlan Lake |
Pöyry Oy/Universidad Galileo |
Feasibility study and action plan for improving the current status of the Amatitlan lake through bioenergy |
(7) Under Execution |
€ 150000.00 |
| 117 |
Guatemala |
4.48 |
Optimization of the cost efficient solar thermal system |
Soluciones Creativas S.A. |
Determine the performance data of the collector and the overall system in order to be able to predict the annual solar yields of the system |
(8) Finished |
€ 54000.00 |
| 118 |
Guatemala |
4.49 |
Production and saving of biomass forest through reforestation and firewood saving stoves in three rural communities of the Plateau of the West of Guatemala. |
Fundación para el Desarrollo Integral de Programas |
To promote the rational and sustainable handling of renewable natural resources of the Western Plateau of Guatemala, through the production and saving of biomass forest to improve the quality of atmosphere and health of the beneficiaries. |
(7) Under Execution |
€ 40000.00 |
| 119 |
Guatemala |
4.50 |
Hydroelectric Viejo Town |
Empresa Campesina Asociativa Pueblo Viejo |
Hydroelectric Viejo Town |
(9) Inactive |
€ 50000.00 |
| 120 |
Guatemala |
4.51 |
Generation of electrical energy through the biodigestión of the agricolas and municipal organicos remainders in Santa Cruz of Quiché |
Municipalidad de Santa Cruz del Quiché |
Generation of electrical energy through the biodigestión of the agricolas and municipal organicos remainders in Santa Cruz of Quiché |
(9) Inactive |
€ 30000.00 |
| 121 |
Guatemala |
4.52 |
Feasibility study for the Project: Hydroelectric on the Zarco River, in the Biosphere Reserve Mountain range of the Mines, Panzós, Verapaz Discharge, Guatemala |
Fundación Defensores de la Naturaleza |
Feasibility study for the Project: Hydroelectric on the Zarco River, in the Biosphere Reserve Mountain range of the Mines, Panzós, Verapaz Discharge, Guatemala
|
(7) Under Execution |
€ 40000.00 |
| 122 |
Guatemala |
4.53 |
Electrical generation by means of the Binary System Using Geotermia) SECOND PART |
Mesón San Michkael, Sociedad Anónima |
Electrical generation by means of the Binary System Using Geotermia) SECOND PART
|
(7) Under Execution |
€ 75000.00 |
| 123 |
Guatemala |
4.54 |
Generation of energy by means of a micro hydroelectric power station for the forest and productive development of the zone of Yalambojoch, Huehuetenango, Guatemala |
Fundacion Solar |
To improve the productivity and water supply of the region of Yalambojoch by means of the generation of energy by means of the advantage of the hydric resource, contributing to the process of transformation of the wood
|
(4) Elaborating contract |
€ 153846.00 |
| 124 |
Guatemala |
4.56 |
Electrification of isolated rural communities Quiché |
Fundacion de Reconstruccion y Desarrollo |
|
(2) Projects in Revision |
€ 73846.00 |
| 125 |
Guatemala |
4.57 |
Hydroelectric Los Cerros II " |
Energia Nacional S.A. |
|
(2) Projects in Revision |
€ 50000.00 |
| 126 |
Honduras |
5.01 |
PAI (Streghtening of the cold chain for the vaccination program) |
Secretaría de Salud de Honduras y el Programa Ampliado de Inmunizaciones (PAI) y NAPS Systems |
To Install 8 Photovoltaic systems in Health centers located in remote areas for vaccines and medicines refrigeration. |
(8) Finished |
€ 50000.00 |
| 127 |
Honduras |
5.03 |
Rational and Sustainable Use of Firewood through the Construction of Ecological Stoves for Rural Communities in Amarateca Valley, Honduras |
Asociación Hondureña para el Desarrollo (AHDESA) |
Construction of 720 ecological stoves ?Justa?, in order to improve the quality of life of the families in Tamara and Amarateca Valleys, Municipality of the Central District of the Department Francisco Morazán, Honduras |
(8) Finished |
€ 40000.00 |
| 128 |
Honduras |
5.05 |
Feasibility Study for the Usage of Alternative Fuels (Municipal Solid Waste) at the Cement Plant CENOSA |
CENOSA |
To evaluate the impact of the use of solid waste as an alternative fuel in the cement plant |
(8) Finished |
€ 27000.00 |
| 129 |
Honduras |
5.06 |
Solar Pumps for Sustainable Agriculture |
SERNA |
Install solar pumping systems for agriculture uses. |
(8) Finished |
€ 19500.00 |
| 130 |
Honduras |
5.07 |
Study and final designs for hydro generation La Presa |
Ecoaldeas de Honduras |
The project consist in the rehabilitation of a mini hidro with a potential capacity of 100 kw, at the north of the community Minas de Oro, Comayagua Department, Honduras |
(8) Finished |
€ 8000.00 |
| 131 |
Honduras |
5.08 |
Solar pumping for sustainable agriculture |
SERNA |
To install solar systems for water pumping in agricultural in the Municipality of Orica, Department El Paraiso to 103 kilometers of the Tegucigalpa Capital |
(8) Finished |
€ 14000.00 |
| 132 |
Honduras |
5.09 |
Bioethanol |
SERNA/ Procesadora Agroindustrial las Lomas, S.A. |
To produce ethanol from an existing plant that is already producing alcohol |
(8) Finished |
€ 15000.00 |
| 133 |
Honduras |
5.12 |
Jatropha Curcas Plantation in Honduras |
Inversiones San Martín |
To grow a plantation of 4 Ha to produce Jatropha Curcas for future use as biofuel |
(8) Finished |
€ 18750.00 |
| 134 |
Honduras |
5.17 |
Strategic Environmental Assessment for the development of biofuel production projects |
Presidencia de la República |
To identify, characterization and assessment of the possible environmental impacts of biofuels production projects in four valleys of the countries: Agalta, Jamastrán, Talanga and Comayagua |
(8) Finished |
€ 21957.00 |
| 135 |
Honduras |
5.19 |
Using biodiesel in a segment of the public transportation |
SERNA/Bio Transporte S.A. |
To test and promote the use of biodiesel in 50 units of public transportation in Tegucigalpa, which is the second city with more air pollution en Latin America, with the objective to achieve the self supply by the cultive of Jatropha curcas. |
(7) Under Execution |
€ 45000.00 |
| 136 |
Honduras |
5.20 |
Solar technologies as compensation for environmental services |
Mediterrània-CIE/Fundación Vida |
Installation of PV systems for pumping, refrigeration and electrification in the school of the community of Las Pitas |
(8) Finished |
€ 25000.00 |
| 137 |
Honduras |
5.21 |
Feasility study waste to energy in Puerto Cortés, Honduras |
BIOENERGIA R4E PUERTO CORTES |
To perform feasibility studis for the usage of the solid waste to energy in Puerto Cortés, Honduras |
(7) Under Execution |
€ 71166.00 |
| 138 |
Honduras |
5.23 |
Project of Biodigestor in the Negrito, Yoro |
Agrónomos Ambientalistas y Consultores S.A (AGRACONSA) |
Project of Biodigestor in the Negrito, Yoro
|
(8) Finished |
€ 50000.00 |
| 139 |
Honduras |
5.24 |
Implementation of Efficient Furnaces " Manny " and " Right " Echo Furnaces in sixty families who dedicate to the production and commercialization of artisan ceramics in the Municipalities of Ojojona and Santa Ana, Department of Francisco Morazán, Honduras |
Asociación Hondureña para el Desarrollo |
Implementation of Efficient Furnaces " Manny " and " Right " Echo Furnaces in sixty families who dedicate to the production and commercialization of artisan ceramics in the Municipalities of Ojojona and Santa Ana, Department of Francisco Morazán, Honduras |
(8) Finished |
€ 60000.00 |
| 140 |
Honduras |
5.25 |
Hydroelectric Project San Martín, Honduras |
Desarrollos Renovables S.A (DERESA). |
Hydroelectric Project San Martín, Honduras
|
(7) Under Execution |
€ 100000.00 |
| 141 |
Honduras |
5.26 |
Construction of ecological furnaces in communities of the Park Nacional Patuca and its zone of influence |
Empresa Asociativa Campesina de Producción Cuyamel EACPAC |
Construction of ecological furnaces in communities of the Park Nacional Patuca and its zone of influence
|
(7) Under Execution |
€ 40000.00 |
| 142 |
Honduras |
5.27 |
Hydroelectric project Chinacla Department of Intibucá, Honduras |
Hidroeléctrica de la Sierra S.A. de C.V. (HIDROSIERRA) |
Hydroelectric project Chinacla Department of Intibucá, Honduras
|
(7) Under Execution |
€ 200000.00 |
| 143 |
Honduras |
5.28 |
Feasibility study for a project of Aeolian electrical generation in Honduras. Additional evaluations |
Vientos de Yamaranguila S.A. |
Feasibility study for a project of Aeolian electrical generation in Honduras. Additional evaluations
|
(5) Contract in Signature |
€ 35000.00 |
| 144 |
Honduras |
5.29 |
Renewable qualification, investigation and promotion on energias in the farming and forest sector of the Central American region |
E.A.P. Zamorano |
Renewable qualification, investigation and promotion on energias in the farming and forest sector of the Central American region |
(7) Under Execution |
€ 35000.00 |
| 145 |
Honduras |
5.30 |
?Photovoltaic Energy like platform for the development of poor and vulnerable families in the south of Honduras? |
Fundación Hondureña de Ambiente y Desarrollo Vida |
Installation of solar paddles in 72 houses that meet the conditions of stepped way |
(7) Under Execution |
€ 69230.00 |
| 146 |
Honduras |
5.31 |
Mini Hydroelectric power station Guinean River like supplier of Clean Energy in a countryside with environmental, social and economic benefits in its area of influence. |
ECOENERGIA,S.A |
Construction of a Mini Hydroelectric Power station to water edge (420KW) that proveera of clean energy to two rural communities in the east of Honduras (Patuca and Nueva Choluteca), located to 200 kilometres of the capital of Honduras in the Department of Olancho. |
(7) Under Execution |
€ 153846.00 |
| 147 |
Honduras |
5.32 |
Substitution of traditional stoves by Eco-stoves Justa |
FUNDHEI |
To contribute to the sustainable development of the inhabitants of the marginal urban neighbor through the substitution of traditional stoves by Eco stoves Justa, like an alternative cleaning that contributes to the development of the zone |
(4) Elaborating contract |
€ 53846.00 |
| 148 |
Honduras |
5.33 UE |
Clean energy for the Public Health |
RETE |
To contribute to improve the access to the sustainable, renewable power services, to the system of health of the population of the department Gracias a Dios with the purchase of solar panels |
(7) Under Execution |
€ 195585.00 |
| 149 |
Nicaragua |
6.01 |
-Feasibility Study for the Project "Electric Energy Generation with Biomass" |
Atlantic, S.A. |
-Feasibility study for a 5 MW electric energy generation plant, producing with biomass resources (coffee and rice shell and rice straw), for the Company Atlantic. |
(8) Finished |
€ 60000.00 |
| 150 |
Nicaragua |
6.02 |
Support for the Small Hydroelectric Project "El Bote" |
ATDER-BL |
Providing the authomatic control and measurement equipments, the low voltage switchgear, and the protection equipment for the generators of the hydroelectric project "El Bote", for 900 kW generation, located in the
municipality of El Cuá in the Department of Jinotega, in the sector North-central of Nicaragua.
|
(8) Finished |
€ 100000.00 |
| 151 |
Nicaragua |
6.04 |
Local Production of Wind Generators in Rural Areas |
IPCC-INATEC-BlueEnergy |
To produce and install 3 wind generators as a demonstrative project in a Rama Community in Bluefields. |
(8) Finished |
€ 83371.00 |
| 152 |
Nicaragua |
6.06 |
Water pumping with PV solar energy for the flowers and vegetables production in 8 tunnels managed by women.Community Los Arados - Mozonte |
Asociación Fénix |
Installation of a Photovoltaic Solar system to actionate a waterproof water pump, located in the interior of a tank built on the river side; the water will be prompted and conducted by a 280 Mts. lenght tube, directed to a storage tanks system in the production area, the water from the well will be distributed by gravity to a leak irrigation system, distributed in 8 tunnels for the production of flowers and vegetables. |
(8) Finished |
€ 25000.00 |
| 153 |
Nicaragua |
6.07 |
Formulation of a Guideline for investing in Renewable Energy in Nicaragua |
Comisión Nacional de Energía (CNE) |
Formulate a document with the guidelines, requirements, procedures, etc. for investing in renewable energies in Nicaragua.
|
(8) Finished |
€ 3849.00 |
| 154 |
Nicaragua |
6.08 |
Mini Hydroelectric Power Plant Las Nubes |
Cooperativa Multisectorial Apante R.L (COOAPANTE). |
Installing a micro hydroelectric turbine of 8 kW to use the water as renewable resource. It will supply some of the energy demand of the area. The community Las Nubes #2 has 97 families and a population of 560 inhabitants. A new approach of the technical data has been presented and design for the mini electric network in the community The Clouds #2, for the construction of a microcomputer hydroelectric power station of 12 kW of power, taking advantage of an efficient fall in the zone, where some waterfalls with acceptable potential exist and to use the water resources, to supply in certain way the energy demand of the zone |
(8) Finished |
€ 17800.00 |
| 155 |
Nicaragua |
6.09 |
Design and Construction of 5 mini Hydroelectric Power Plants |
Comisión Nacional de Energía (CNE) |
The project includes the construction and installation of 5 micro turbines between 5 and 08 kW of power, to be installed in productive units (farms) which have the hydroelectricity potential and that are located in rural areas of the country, Departaments of Jinotega and Region of Northern Atlantic (RAAN), which are not connected to the national grid. The selected sites are: i) La Samaria, town El Bote, Municipality El Cuá, Jinotega (7 kW), ii) Aguas Rojas, Municipality Wiwilí, Jinotega (5 kW), iii) Las Piedrecitas, La Pita El Carmen, Municipality El Cuá, Jinotega (7 kW), iv) Santa Rosa, Municipality El Cuá (4.6 kW),v) Los Milagros, town El Naranjo, Municipality Waslala, RAAN (8 kW).
|
(8) Finished |
€ 50000.00 |
| 156 |
Nicaragua |
6.11 |
Feasibility Study for the Wind Plant El Crucero |
WinWind/ENCO |
To perform a feasibility/bankable study for a multiple MW park and to install a pilot 5 kW wind turbine. |
(8) Finished |
€ 50000.00 |
| 157 |
Nicaragua |
6.13 |
Feasibility study and design of the small hidro project "La Florida" |
Comisión Nacional de Energía (CNE) |
Formulate a feasibility study and design for the development of La Florida hydroelectric power plant (200 kW), benefiting the town of Kubali and neighboring communities in the Municipality of Waslala, Authonomus Region of the North Atlantic (RAAN) |
(8) Finished |
€ 40000.00 |
| 158 |
Nicaragua |
6.14 |
Hidroelectric Power Plan El Bote, Final commission |
ATDER-BL/ABB |
Technical support for the final tests and adjustment fo the Hydroelectric Power Plant El Bote
|
(8) Finished |
€ 12000.00 |
| 159 |
Nicaragua |
6.15 |
Feasibility studies for a set of micro hydros in RAAN |
Geoingenieria/ ENEL |
Feasibility studies for assessing the hidro potential of 3 identified sites and the design of the minihydro power plants. |
(8) Finished |
€ 100000.00 |
| 160 |
Nicaragua |
6.16 |
Biomass torch for ceramics, designed in La Paz |
Conglomerado de cerámica de San Juan Oriente, Dpto. de Masaya con el apoyo de ONUDI |
To install and commissioning of a biomass burners for ceramics process.
|
(8) Finished |
€ 17143.00 |
| 161 |
Nicaragua |
6.17 |
Thermal solar enegy for hospitals |
Ministerio de Energía y Minas |
Assessment of the energy savings by using thermal solar systems in hospitals. Make an analysis cost/benefits and possible barriers to use this technology |
(7) Under Execution |
€ 50000.00 |
| 162 |
Nicaragua |
6.18 |
Capacity building in energy efficiency for the promotion of the saving and efficient use of the energy |
Asociación Centro de Producción más Limpia de Nicaragua |
Elaborate and to execute a proposal for the promotion of the energy efficiency in Nicaragua, directed to the governmental and private sector; which offers information to the consumers on the improvement in the use of energy, promoting measured in energy efficiency, its costs and benefits |
(8) Finished |
€ 35000.00 |
| 163 |
Nicaragua |
6.19 |
Rural electrification thought solar energy technology for the implementation of sustainable cattle and social welfare of the families in the Rama municipality |
PADESAF - RAMA |
|
(8) Finished |
€ 15000.00 |
| 164 |
Nicaragua |
6.21 |
Construction of micro hydros in isolate areas of Nicaragua |
Ministerio de Energía y Minas (MEM) |
Construction of 5 micro hydros in selected sites. Power range form 10 to 50 kW |
(8) Finished |
€ 60000.00 |
| 165 |
Nicaragua |
6.22 |
Follow up of the project construction of 5 micro hidros |
ATDER-BL |
Follow up for checking operation and perfomance of the 5 microhidros installed in Nicaragua |
(8) Finished |
€ 5000.00 |
| 166 |
Nicaragua |
6.23 |
Photovoltaic project in Shrimp production units |
Universidad Nacional Autónoma de Nicaragua León. |
To install 18 PV equipments in the same number of shrimp production units and a gathering centre |
(8) Finished |
€ 24000.00 |
| 167 |
Nicaragua |
6.25 |
To sincronize the Bocay micro hidro |
ATDER-BL |
To install the required equipments to sincronize the Bocay hidro power for grid interconnection, in order to optimize the energy production |
(7) Under Execution |
€ 20000.00 |
| 168 |
Nicaragua |
6.26 |
Hidroelectricity for social, environmental and productive usages in Boaco |
Asociación de Municipios del Departamento de Boaco, (AMUB). |
To organize communities, energy companies and build 5 micro hidros for 5 commmnunities (300 families) in Boaco |
(8) Finished |
€ 100000.00 |
| 169 |
Nicaragua |
6.27 |
Feasibility studies and construction of three microhidros in isolated areas |
ATDER-BL |
To perform feasibility studies for 3 micro hidros (4 - 10kW) in isolated areas in Jinotega |
(8) Finished |
€ 40714.00 |
| 170 |
Nicaragua |
6.28 |
Hydro power generation in La Laguna, San José Los Remates |
Asociación Fénix |
Feasibility study and construction of a hydro power (200kW) in La Laguna, San José los Remates, Boaco |
(8) Finished |
€ 40000.00 |
| 171 |
Nicaragua |
6.29 |
Wood dryer for furniture industry |
Corporación Intermunicipal de Desarrollo Económico Local CIDEL |
To construct a solar wood dryer for the Masatepe wood/furniture industry |
(4) Elaborating contract |
€ 30000.00 |
| 172 |
Nicaragua |
6.30 |
Paso Real Hydro project |
Desarrollo Hidroelectricos de Nicaragua, S.A. |
Feasibility studies for PH Paso Real |
(8) Finished |
€ 150000.00 |
| 173 |
Nicaragua |
6.31 |
Usage of PV energy and UV radiation for the depuration of molluscaes in the Aserradores community |
Universidad Centroamericana (UCA) |
To eliminate patogens in bivalves using PV for energy supply and UV radiation |
(8) Finished |
€ 14756.00 |
| 174 |
Nicaragua |
6.32 |
Efficiency in the production of tiles and bricks |
Fabrica de Ladrillo Sr. Antonio |
To build an improved oven for cooking tiles and bricks, improvements in the process and to install a biomass torch for the oven |
(7) Under Execution |
€ 12200.00 |
| 175 |
Nicaragua |
6.33 |
Biodigestors construction in dairies (fincas) for energy generation in the north-central region of Nicaragua |
CANISLAC (Cámara Nicaragüense del Sector Lácteo) |
Biodigestor construction and installation of energy generators |
(7) Under Execution |
€ 24962.00 |
| 176 |
Nicaragua |
6.34 |
Construction of La Florida small hydro power plant |
Ministerio de Energia y Minas (MEM) |
To build and install 2 x 150kW turbines, including civil works, electromechanic equipments, electric grids |
(7) Under Execution |
€ 150000.00 |
| 177 |
Nicaragua |
6.35 |
Feasibilty study for energy generation using biomass from forestry resources |
POYRY |
Feasibility study to prove the technical and economical aspects of energy generation using the forest residues created by huracán Felix in Nicaragua |
(8) Finished |
€ 25000.00 |
| 178 |
Nicaragua |
6.36 |
Technology adaptation of geothermal heat pumps for refrigeration in |
Electric Systems S.A. |
To install a geothermal heat pump system with the aim of energy savings in the order of 50% |
(8) Finished |
€ 70000.00 |
| 179 |
Nicaragua |
6.37 |
Improvement and control of sustainability of production of dendroenergy from tropical forests in the Pacific area of Nicaragua |
Instituto Nacional Forestal-INAFOR |
To develop a system for the improvement and control of the sustainability of fire wood production in the Pacific area of Nicaragua |
(7) Under Execution |
€ 80000.00 |
| 180 |
Nicaragua |
6.38 |
Water heating with biogas and solar collectors |
CPML-N |
Design and installation of a hybrid system using biogás through a biodigestor to adapt to the thermal Solar System of water heating of the Hotel Villa Paradise.
|
(8) Finished |
€ 10000.00 |
| 181 |
Nicaragua |
6.39 |
Innovations on the firewood supply chains as a primary source of energy for its sustainable and efficient use, in Sandino City, Municipality of the Department of Managua, Nicaragua. |
Facultad de Ciencia, Tecnología y Ambiente de la Universidad Centroamericana (UCA) |
To contribute to reduce poverty and get a sustainable use of the energy resources, introducing not only technological but also organized innovations so that these chains are more equitable, sustainable and energy efficient, increasing the income of the producers and reducing the costs to the final consumers. |
(5) Contract in Signature |
€ 50000.00 |
| 182 |
Nicaragua |
6.40 |
Construction of 22.5 kW micro hydropower plant in Valle Los Condega community, in the Municipality of El Cua, Department of Jinotega. |
ATDER-BL |
Construct the 22.5 kW micro hydroelectric power plant to benefit more that 80 houses in the community Valley the Condega, municipality of the Cua, department of Jinotega. |
(2) Projects in Revision |
€ 40000.00 |
| 183 |
Nicaragua |
6.41 |
Implementation of Biodigestors in the Nicacentro Cooperative partners´ farms, for the environment protection and the well-being of the family in the Nicaraguan Via Látea. |
Cooperativa Multisectorial Lácteos Nicacentro, R. L. |
To implement the use of low cost biodigestors, Taiwanese type, for the integrated handling of the manure produced by animals in the of the Nicacentro partners´ farms. |
(7) Under Execution |
€ 25000.00 |
| 184 |
Nicaragua |
6.42 |
Alternative for the sustainable use of the forest resource - firewood - for the energy supply and energy saving in the consumption in rural homes. |
CENADE |
To improve and/or to increase the availability of the energy resource - firewood - through the efficient use of firewood saving stoves in 14 communities of the municipalities of Darío, Sébaco and Terrabona of the department of Matagalpa. |
(8) Finished |
€ 30000.00 |
| 185 |
Nicaragua |
6.43 |
Use of solar dryers for the diversification of the productive process in the Agro-industrial plant AGROIDSA of FUPADE in the dry tropic of Matagalpa, Nicaragua. |
Fundación para el Desarrollo (FUPADE) |
The use of a solar dryer for the dehydration of fruits, and vegetables will allow the reactivation process and the productive reorganization of the processor plant. This will allow the most efficient plant operation facing to achieve its competitiveness in the local, national and regional market. |
(8) Finished |
€ 30000.00 |
| 186 |
Nicaragua |
6.44 |
Technical feasibility study, design and construction of a 50 kW mini hydroelectric power station, on the pipeline of crude water in Treatment Plant of the City of Matagalpa. |
Empresa Aguadora de Matagalpa |
Elaboration of a technical feasibility study, design and construction of a 50 kW mini hydroelectric power station, on the crude water pipeline of Treatment Plant of the City of Matagalpa |
(9) Inactive |
€ 21000.00 |
| 187 |
Nicaragua |
6.45 |
Manufacture of receivers of flat plate and hot water storage cells direct in Nicaragua |
Suni Solar, S.A. |
Manufacture of receivers of flat plate and hot water storage cells direct in Nicaragua
|
(7) Under Execution |
€ 35000.00 |
| 188 |
Nicaragua |
6.46 |
Construction of a Small Hydroelectric Power station of 87 Kw. in the Good community Vista, New Guinea RAAS |
Asociación de Municipios de Zelaya Central |
Construction of a Small Hydroelectric Power station of 87 Kw. in the Good community Vista, New Guinea RAAS
|
(2) Projects in Revision |
€ 100000.00 |
| 189 |
Nicaragua |
6.47 |
Construction of Small Hydroelectric Power station of 76,7 Kw. in the community the Milpas, New Guinea RAAS |
Asociación de Municipios de Zelaya Central |
Construction of Small Hydroelectric Power station of 76,7 Kw. in the community the Milpas, New Guinea RAAS
|
(2) Projects in Revision |
€ 120000.00 |
| 190 |
Nicaragua |
6.48 |
Ecological brick production for the construction of conditionned houses in the Dry Tropic of Matagalpa, Nicaragua |
Fundación para el Desarrollo (FUPADE) |
Ecological brick production for the construction of conditionned houses in the Dry Tropic of Matagalpa, Nicaragua
|
(2) Projects in Revision |
€ 40000.00 |
| 191 |
Nicaragua |
6.49 |
Innovating mechanism to promote the investment in technologies of renewable energies and power efficiency in the PYMES |
Centro de Producción más Limpia de Nicaragua |
Innovating mechanism to promote the investment in technologies of renewable energies and power efficiency in the PYMES
|
(7) Under Execution |
€ 30000.00 |
| 192 |
Nicaragua |
6.50 |
Program of Education in Renewable Energies with emphasis in Efficiency and Power Saving to produce with competitiveness and enterprise vision |
Educativo Handelsges.m.b.H |
Program of Education in Renewable Energies with emphasis in Efficiency and Power Saving to produce with competitiveness and enterprise vision
|
(7) Under Execution |
€ 60000.00 |
| 193 |
Nicaragua |
6.51 |
IMPROVED THE PRODUCTIVE PROCESS OF THE FISHING WITH THE APPROPRIATE USE OF TECNOLOGIA WITH THE ALTERNATIVE USE OF ENERGIA BY MEANS OF A PLANT PROCESSOR FOR THE DEHYDRATION OF FISH IN THE COMMUNITY HILLS OF PONELOYA, DEPARTMENT OF LEON. |
COOPERATIVA PRIMERO DE SEPTIEMBRE |
IMPROVED THE PRODUCTIVE PROCESS OF THE FISHING WITH THE APPROPRIATE USE OF TECNOLOGIA WITH THE ALTERNATIVE USE OF ENERGIA BY MEANS OF A PLANT PROCESSOR FOR THE DEHYDRATION OF FISH IN THE COMMUNITY HILLS OF PONELOYA, DEPARTMENT OF LEON.
|
(8) Finished |
€ 26000.00 |
| 194 |
Nicaragua |
6.52 |
Establishment of systems of irrigation in compact areas with advantage of the energy solar, in twelve units productive in six communities in the municipality of Teustepe, department of Boaco, Nicaragua. |
Asociación Fénix |
Establishment of systems of irrigation in compact areas with advantage of the energy solar, in twelve units productive in six communities in the municipality of Teustepe, department of Boaco, Nicaragua.
|
(7) Under Execution |
€ 45000.00 |
| 195 |
Nicaragua |
6.53 |
Feasibility study of renewable saving and power efficiency combined with energias (conditioned air to pave) in the international airport Augusto Cesar Sandino |
Empresa administradora de aeropuertos internacionales |
Feasibility study of renewable saving and power efficiency combined with energias (conditioned air to pave) in the international airport Augusto Cesar Sandino
|
(5) Contract in Signature |
€ 50000.00 |
| 196 |
Nicaragua |
6.54 |
Energy efficiency in the Sector Rosquillas of the urban zone of the municipality of Zomoto |
Amigos de la Tierra España |
To improve the production systems of doughnuts from the improvement of the efficiency in the firewood consumption that require the production of doughnuts from the introduction of improved furnaces, |
(7) Under Execution |
€ 0.00 |
| 197 |
Nicaragua |
6.55 |
FEASIBILITY STUDY HYDROELECTRIC MINI-POWER STATION THE VERBENA IN THE MUNICIPALITY OF SAN RAMON, MATAGALPA, REPUBLIC OF NICARAGUA |
Empresa Nicaragüense de Electricidad (ENEL) |
To make the Feasibility study, Final Design and Documents of Licitation to construct to the works for the Mini Hydroelectric Power station the 2,2 Verbena of Mw of Installed capacity. |
(4) Elaborating contract |
€ 100000.00 |
| 198 |
Nicaragua |
6.56 |
Study of Prefactibilidad Hydroelectric Project El Carmen Rio Grande of Matagalpa |
Empresa Nicaragüense de Electricidad (ENEL) |
To promote the use of solar paddles for the provision of renewable energy and energy efficiency, in the communities Rincon de los Bueyes, El Remolino y El Guacucal. |
(4) Elaborating contract |
€ 115384.00 |
| 199 |
Nicaragua |
6.57 |
Grant of photovoltaic electrical energy to communitarian center of communications and soothes of Indigenous the Territorial Government in San Andres de Bocay, Nicaragua. |
Gobierno del Territorio Miskitu Indian Tasbaika Kum |
To improve the condition of life of the inhabitants of the community of San Andres de Bocay by means of the renewable advantage of energy for productive uses and communication. |
(4) Elaborating contract |
€ 38461.00 |
| 200 |
Nicaragua |
6.59 |
Application and research center in energy efficiency of alternative energies in the Technological Complex the Salle |
Instituto Politecnico La Salle |
To design a half technical training with specialty in ER and EE; competitive, that promotes intestigacion and the development of the same, to contribute to the economic growth of the country. |
(7) Under Execution |
€ 100000.00 |
| 201 |
Nicaragua |
6.60 |
Establishment of 1932 saving kitchens of firewood and 311 solar paddles for the communities of the six Municipalities of the Department of Boaco, |
Asociacion de Municipios del Departamento de Boaco (AMUB) |
To improve the quality of life of the settlers of the communities of the municipalities of the department of Boaco through installing sustainable friendly alternatives to the environment to contribute to the local development |
(7) Under Execution |
€ 38461.00 |
| 202 |
Nicaragua |
6.61 |
Solar dryer for the drying of Cacao |
Federación Nacional de Cooperativas Agropecuarias y Agroindustriales |
To construct a mixed dryer solar thermal and biomass that allows the suitable drying of the cacao |
(1) Projects in Formulation |
€ 38461.00 |
| 203 |
Nicaragua |
6.62 |
Improved stoves and Establishment of Forest Plantations in Country zones |
CENADE |
To improve the availability and the rational of the firewood through efficient use of stoves of saving of firewood in 11 rural communities of the municipalities of Darío and Sébaco of the department of Matagalpa |
(4) Elaborating contract |
€ 23076.00 |
| 204 |
Nicaragua |
6.63 |
Solar technology in the Communities Hato Viejo and La Mora |
Alcalde Municipal de Santa Rosa del Peñón |
To contribute to the improvement of the conditions of life of the population in the communities of Hato Viejo and La Mora, by means of the advantage of the solar light like renewable energy |
(4) Elaborating contract |
€ 85230.00 |
| 205 |
Nicaragua |
6.64 |
Solar technology in the Communities the Pavón and La Pita |
Alcaldesa Municipal de El Jicaral |
Domiciliary electrification through solar energy in the communities the Pavón and La Pita
|
(4) Elaborating contract |
€ 35769.00 |
| 206 |
Nicaragua |
6.65 UE |
Center of rural of technical capacity building in renewable energy and energy efficiency |
Fundación Chica |
Capacty building in renewable energy and energy efficiency |
(7) Under Execution |
€ 184050.00 |
| 207 |
Nicaragua |
6.66 UE |
Promotion of the use of the renewable energies for the farming production in Chontales |
Horizon 3000 |
Promotion of the use of the renewable energies for the farming production in Chontales |
(7) Under Execution |
€ 396695.00 |
| 208 |
Panama |
7.01 |
Implementation of Photovoltaic Energy Systems for Basic Infrastructure in the Communities Ustupu y Ogobsucun, Aligandi Town, Region Kuna Yala, Panama |
Autoridad Nacional del Ambiente (ANAM) |
Donate to the community photovoltaic solar technology equipment for electricity generation in the island; including basic services infrastructure: 2 primary schools, 2 health centers, 2 houses of congress, 8 streets luminaries, 1 labor house, 1 library and 14 dwellings, in order to improve the teaching conditions, allow the nocturnal lighting for the communities, guarantee the lighting of social and health areas and to establish a pilot plan in some houses, and initiate a sustainable energy consumption model for the target population |
(8) Finished |
€ 110000.00 |
| 209 |
Panama |
7.02 |
Solar Pumping for Sustainable Agriculture |
Autoridad Nacional del Ambiente (ANAM) |
To install solar systems for water pumping in rural areas |
(8) Finished |
€ 39000.00 |
| 210 |
Panama |
7.03 |
Implementation of an Energy Generation System from Biogas Produced with Residues of an Agroindustrial Pork Farm, Veraguas Region, Panama |
Autoridad Nacional del Ambiente (ANAM) |
This project includes the design and implementation of a anaerobic biodigestor for the production of biogas in a pork farm in the Community of San Pedro del Espino, District of Santiago in Veraguas Region |
(8) Finished |
€ 39000.00 |
| 211 |
Panama |
7.04 |
Implementation of a photovoltaic pumps system for drinking of cattle |
ANAM |
The project consist in the implementation of photovoltaic systems to supply from water to two property of Azuero and Chiriqui region, where the water supply represents a serious problem for the cattle sector |
(8) Finished |
€ 25000.00 |
| 212 |
Panama |
7.06 |
Feasibility Study for Santa Fe Wind Project (Phase II) |
Electrowatt Ekono / WinWInd |
To support a wind energy project of 80 MW. The study includes environmental assessment, additional measurement and bankable study. |
(8) Finished |
€ 120000.00 |
| 213 |
Panama |
7.07 |
|
ANAM |
|
(8) Finished |
€ 30000.00 |
| 214 |
Panama |
7.12 |
Design and implementation of a system for ethanol production, using residues from dairy biproducts |
ANAM |
To design and construct a reactor to produce ethanol from dairy biproducts in Chiriquí province, where there is a high productivity in the agricultural and cattle activities. Here is the main production of milk, cheese, rice, beans, coffee, tobaco, corn, potato, vegetables, sugar cane and vegetable oils. |
(8) Finished |
€ 60000.00 |
| 215 |
Panama |
7.15 |
Training for Kuna Yala community, Solar Energy |
Oficina Regional |
Extended program for capacity building in Kuna Yala territories, for a technician in Ustupu for equipment maintenance |
(8) Finished |
€ 4500.00 |
| 216 |
Panama |
7.16 |
Electricity production from peat |
ANAM |
To perform a feasibility study to develop an energy production plant using peat deposits in Bocas del Toro |
(8) Finished |
€ 50000.00 |
| 217 |
Panama |
7.17 |
Research project for assessing the properties of Moringa oleifera to produce etanol, biodiesel and/or biomass |
Universidad de Panama, Facultad de Ciencias Agropecuarias |
To perform a scientific research study for assessing the potential alternatives for biodiesel, ethanol and subproducts production, through biomass proceeding from the seeds of Moringa oleifera Lam. Studies demonstrate that this seeds could produce 600 Tons of biomass per Hc/year. It can produce lot of biodiesel, and it could produce ethanol from sugar and starch. |
(7) Under Execution |
€ 70000.00 |
| 218 |
Panama |
7.18 |
PV systems for Embera communities in Panama |
ANAM |
To install PV systems in homes of the Embera community, Parara Puru and the installation of PV systems in the school and tourism office, for the development of this area and support the incomes increase. This community is located in the National Park Chagres, with an extension of 2 Hc. |
(8) Finished |
€ 24423.00 |
| 219 |
Panama |
7.19 |
Wind energy to increase the availability of water pumping in central provinces of Panama |
ANAM |
To install wind turbines for water pumping from underground sources and provide the hydro resource to the Province of Cocle in Hato River, Las Guabas and Llano Marin, critic areas affected by the drought in Panama |
(8) Finished |
€ 20000.00 |
| 220 |
Panama |
7.20 |
Start up of manufacturing of pico- and micro hydro generators and small wind turbines using a patented Directly Driven Radial Flux, Permanent Magnet Generator. |
Clement Energy Engineering |
start up of a manufacturing company in Panama dedicated to the industrialization of a unique product based on patented low RPM radial flux permanent magnet generator |
(8) Finished |
€ 30000.00 |
| 221 |
Panama |
7.22 |
Use of wind energy in protected areas of Panama |
ANAM y DAWCAS S.A. |
Implementing a self energy generation system through mini wind turbines for electric consumption in visitor centers and shelters of two protected areas in Panama |
(8) Finished |
€ 20000.00 |
| 222 |
Panama |
7.23 |
Construction of 10 biodigester in pig farms to produce biogas in the High Side of the River Chiriqui Viejo |
ANAM |
Minimizing the environmental impact produced by the bad management of the animal excretes in farms near to water sources, by means of the implementation of Cleaner Production practices and Clean Technologies as the anaerobic fermentation, promoting the implementation of renewable energy sources. |
(2) Projects in Revision |
€ 40000.00 |
| 223 |
Panama |
7.25 |
PV Systems for the school |
ANAM/Comunidad Alto Higueron |
To install PV systems for Alto Higuerón School |
(2) Projects in Revision |
€ 0.00 |
| 224 |
Panama |
7.26 |
Design construction and operation of the micro hydro "Emplanada de Chorcha" |
Junta Administradora de Acueducto de Emplanada de Chorcha |
To design and install a 30kW micro hydro in the area of Emplanada de Chorcha for the community of Besiko |
(9) Inactive |
€ 50000.00 |
| 225 |
Panama |
7.27 |
Hybrid system solar/wind for a salt producer community (Santa Ana de los Santos) |
ANAM/ Cooperativa de Salineros Santeños R..L |
To install a solar/wind system for salt production switching the current electrogen (2kw wind/1.2kW solar) |
(8) Finished |
€ 40000.00 |
| 226 |
Panama |
7.29 |
Drinking water supply for a school by using solar pumping system |
ANAM/Escuela de Loma Muleto |
To supply drinking water to the Loma Muleto school to satisfy basic needs, using a PV pumping system |
(2) Projects in Revision |
€ 0.00 |
| 227 |
Panama |
7.30 |
Design, construction and operation of the Gualaquita micro hydro Provincia de Chiriquí, República de Panamá |
Asociación de Productores Agropecuarios de Gualaquita |
To build a 60kW micro hydro in Gualaquita, Provincia de Chiriquí |
(9) Inactive |
€ 50000.00 |
| 228 |
Panama |
7.31 |
Energy Efficiency capacity building in Central America, case Panama |
Motiva/BUNCA |
To improve the central american capabilities in the energy efficiency markets, mainly in the industrial and commercial sector |
(8) Finished |
€ 139000.00 |
| 229 |
Panama |
7.32 |
Implementation of water hammer systems in the Arco Seco sector and the region Ngobe Bugle in the Republica of Panama. |
- |
"To install 8 water hammer pumps in communities of limited resources dedicated to the subsistence agriculture. |
(1) Projects in Formulation |
€ 15000.00 |
| 230 |
Panama |
7.37 |
IMPLEMENTATION OF PHOTOVOLTAIC SYSTEMS FOR THE ELECTRICITY GENERATION |
Municipio de Panamá |
IMPLEMENTATION OF PHOTOVOLTAIC SYSTEMS FOR THE ELECTRICITY GENERATION |
(7) Under Execution |
€ 28500.00 |
| 231 |
Panama |
7.39 |
Project: Plant of food dehydration (fruits and vegetables) administered by men and women of the Association of Producers of the Chilean. Subject: Sustainable production |
Asociación de Productores de El Chileno (APROCHI) / Fundación Red Emprende |
To construct system of food dehydration through solar energy operated by the producers of the Community the Chilean
|
(2) Projects in Revision |
€ 36923.00 |
| 232 |
Panama |
7.40 |
To obtain that through the Qualification, the Power Administrator, of the Public sector realizes an efficient management of the power resources. (Electrical and Hydrocarbons). |
Universidad Tecnológica / Secretaria de Energía |
To obtain that through the Qualification, the Power Administrator, of the Public sector realizes an efficient management of the power resources. (Electrical and Hydrocarbons).
|
(4) Elaborating contract |
€ 23077.00 |
| 233 |
Panama |
7.41 |
Provision of photovoltaic energy for the houses of the Tooth community in the zone of damping of the National Park Santa Fe, Panama. |
Organización para el Desarrollo Sostenible y la Conservación Ambiental (ODESCA) |
?To improve the quality of life of the inhabitants of the Tooth community, through the installation of photovoltaic panels for homemade illumination?.
|
(2) Projects in Revision |
€ 19230.00 |
| 234 |
Panama |
7.42 |
IMPLEMENTATION OF SIMPLE AND CLEAN TECHNOLOGIES IN THE HIGH PART OF THE RIVER BASIN OF THE RIVER SANTA MARIA. |
Programa de Promoción y Desarrollo Social -PRODESO- |
To promote the use and advantage of renewable energies to fortify the management of local organizations and to favor the sustainable human development and the suitable conservation of the natural resources in the high part of the river basin of the River Santa Maria.
|
(4) Elaborating contract |
€ 25385.00 |
| 235 |
Panama |
7.43 |
SOLAR BOXES |
Luz Buena |
To equip the houses with the communities of the districts of extreme poverty of Centers of Charge, with clean, sustainable, and economic, originating energetics of solar paddles of the Solar Kiosco, covering this way the basic needs with illumination, and telecommunication of the houses of that community.
|
(7) Under Execution |
€ 23077.00 |
| 236 |
Panama |
7.44 |
Photovoltaic energy for the pumping system and irrigation by dripping for the production of exotic fruits |
APROFET |
To contribute to the production of fruit trees in the Republic of Panama, being developed a cleaner production system, by means of the implementation of photovoltaic system, to supply an irrigation by dripping to five hectares of export guava.
|
(2) Projects in Revision |
€ 15000.00 |
| 237 |
Panama |
7.45 |
Center of Training in Technology of Information and support to the Social Development, Panama |
Asociación Nacional de Técnicos Forestales de la República de Panamá - ANTEFORP |
to endow the Panamanian Association with Cabinetmakers, a system of solar drying for wood, with the possible capacity nearest 81 net m3s or more, whose annual production will benefit to about fifty associate ones.
|
(2) Projects in Revision |
€ 38461.00 |
| 238 |
Panama |
7.46 |
Installation of solar panels for homes and schools " |
Grupo Comunitario Luisa |
|
(1) Projects in Formulation |
€ 38461.00 |
| 239 |
Regionals |
8.01 |
Feasability study for a Bioenergy plant in Central America (Phase 1) |
Wärtsila finland Oy Biopower |
A feasability study for the usage of biomass, specially sawdust for generating energy |
(8) Finished |
€ 60000.00 |
| 240 |
Regionals |
8.02 |
Central American Carbon Finance Guide |
Green Stream Network OyBUN-CA |
To elaborate a Guide for the Central American countries to support the project developers in the CERs negotiation process |
(8) Finished |
€ 29000.00 |
| 241 |
Regionals |
8.03 |
Water Heating Solar Systems for Central American Tourism Sector |
Dirección de Turismo de SG-SICA / FEDECATUR y Oficina Regional |
Implement solar energy systems for water heating in 1 hotel in each Central American country (total 7 projects). |
(8) Finished |
€ 75000.00 |
| 242 |
Regionals |
8.04 |
Wartsila Biopower Laboratory Container to Perform Biomass Tests |
Wärtsilä Biopower |
Perform biomass samples tests in the region, installing the Container Laboratory in Honduras. |
(8) Finished |
€ 25000.00 |
| 243 |
Regionals |
8.05 |
Feasibility Study for Forest Residues Use on Energy Generation |
Gremial Forestal de Guatemala |
Study to establish the feasibility of forest residues use in the region. |
(8) Finished |
€ 25000.00 |
| 244 |
Regionals |
8.07 |
Fishermen's Products Conservation in Rural Communities in Panamá and El Salvador |
Autoridad Nacional del Ambiente (ANAM) y Cooperativa de Pescadores en El Salvador |
Panamá: The project consists in the installation of 2 freezer that use photovoltaic panels , in the communities of Acapulco and La Palmita, which are located to 5 minutes of La Palma in Darien Province. The community of Acapulco has a total of 9 houses and with a population of 64 inhabitants; and the community La Palmita has a total of 6 houses with a population of 50 inhabitants
|
(8) Finished |
€ 62000.00 |
| 245 |
Regionals |
8.08 |
To facilitate the CDM Process for Partnership's Projects in El Salvador, Guatemala and Honduras |
PCF / Banco Mundial y Oficina de Coordinación Regional |
Support the formulation of 6 Project Design Document (PDD) in the framework of the MDL of the Kyoto Protocol, to the following countries: Guatemala, Honduras and El Salvador; with the main purpose to facilitate the commercialization of the CERs in the carbon market |
(8) Finished |
€ 31000.00 |
| 246 |
Regionals |
8.09 |
Trainee in ABB Finland for a Young Engineer. |
ABB Oy |
The Regional Coordination Office will support the selection process of the candidate and ABB will pay the trainee costs for 6 months. |
(8) Finished |
€ 0.00 |
| 247 |
Regionals |
8.10 |
To construct industrial charcoal ovens to improve the production |
Eco Chaparral/Adolfo Molina |
To construct industrial and efficient charcoal oven as a pilot project in order to demonstrate the improvement of the charcoal production. |
(8) Finished |
€ 33500.00 |
| 248 |
Regionals |
8.12 |
Installation of a Pilot processing plant for biodiesel |
Sociedad Industrial de Aceite de Ricino S.A. de C.V. (SIAR) |
To install a pilot processing plant of biodiesel from "higuerillo" (castor oil). |
(8) Finished |
€ 30000.00 |
| 249 |
Regionals |
8.14 |
Formulation of the Regional Policy on Sustainable Energy |
CCAD / CEPAL / Oficina de Coordinación Regional |
To follow the mandate of San Pedro Sula Declaration (Feb/05), preparing the regional legal framework for sustainable energy generation |
(9) Inactive |
€ 50000.00 |
| 250 |
Regionals |
8.15 |
Central American Biogas Program (Phase I) and Demonstration Phase II |
José Manuel Tay |
Assess the potential areas and projects suitable to be developed as energy projects with biogas, construction of a demonstration plant. A technical assistant will be hire for the construction of 2 biodigestor in El Salvador, including a milk property and a pig property. |
(8) Finished |
€ 10000.00 |
| 251 |
Regionals |
8.16 |
Energy Efficiency Policy in the electricity Sector for Central American and Dominican Republic |
CCAD |
To put into operation a series of actions and measurements for reducing the consumption of electricity and fuel (transportation sector) |
(8) Finished |
€ 20000.00 |
| 252 |
Regionals |
8.18 |
Doing bussiness with Renewable Energies in Central America |
INCAE Bussiness School |
To provide renewable energy project developers with the vision and the knowledge necessary to make their projects successful business ventures |
(8) Finished |
€ 15000.00 |
| 253 |
Regionals |
8.21 |
Toxicity study for the Jatropha |
AEA |
To perform a study to evaluate the toxicity of the Jatropha plantations and its products (vegetal oil and biodiesel) |
(8) Finished |
€ 25000.00 |
| 254 |
Regionals |
8.22 |
Design, integration, norms and regulations for Energy Efficiency in Central America |
SG-SICA |
To integrate the energy office in SICA and to develop the norms, regulations for engines for an Energy Efficiency program |
(8) Finished |
€ 40000.00 |
| 255 |
Regionals |
8.25 |
Support to the "Environment Award" |
CCAD |
To support the evaluation of projects participants in the CCAD's Environment Award |
(8) Finished |
€ 10000.00 |
| 256 |
Regionals |
8.27 |
Jatropha study |
Oficina de Coordinación Regional |
To evaluate the situation of referring projects previous and in course to the production of Biodiesel based on the oil of Jatropha to allow the AEA to make decisions on its involvement in this field, including possible changes
|
(8) Finished |
€ 18000.00 |
| 257 |
Regionals |
8.28 |
Workshop on sharing experiences in the usage of renewables in the Hotel industry of Central American countries |
SITCA |
To organize a regional event for sharing the case studies of usage of renewables in the hotel industry in central american region, with the aim of replicate the projects in other hotels |
(8) Finished |
€ 8500.00 |
| 258 |
Regionals |
8.29 |
Purchase and installation of biodigestors in seven guesthouses of the rural guesthouse net of Central America (one per country). |
SITCA |
To buy, install, put into operation and training for the use of biodigestors for rural guesthouses in each country of Central America, to optimize its operation reducing costs of operation and impacts on the environment. |
(7) Under Execution |
€ 80000.00 |
| 259 |
Regionals |
8.30 |
REGIONAL TRAINING TECHNOLOGIES FOR THE HYDROGEN PRODUCTION El Salvador ? Costa Rica, Centro América |
LAGEO S.A. de C.V. |
To develop a training program at regional level to promote during the next decade the optimal production of hydrogen base on renewable energies resources, that develops or acquires safe devices to transport and storage hydrogen and uses in fuel cells in movile and stationary devices. |
(1) Projects in Formulation |
€ 100000.00 |
| 260 |
Regionals |
8.31 |
Carbon Guidelines |
GreenStream |
Carbon Guidelines |
(8) Finished |
€ 22000.00 |
| 261 |
Regionals |
8.32 |
Challenges and Opportunities of the Central American Region to face the Climatic Change, developing sustentables power solutions within the framework in the Commercial Agreements |
CCAD |
Challenges and Opportunities of the Central American Region to face the Climatic Change, developing sustentables power solutions within the framework in the Commercial Agreements
|
(8) Finished |
€ 40000.00 |
| 262 |
Regionals |
8.33 |
LAUNCHING OF THE V EDITION OF THE REGIONAL PRIZE TO THE CLEANEST PRODUCTION |
Comisión Centroamericana de Ambiente y Desarrollo |
LAUNCHING OF THE V EDITION OF THE REGIONAL PRIZE TO THE CLEANEST PRODUCTION
|
(8) Finished |
€ 25000.00 |
| 263 |
Regionals |
8.34 |
Institutional Fortification of the Power Sector of the countries of SICA for the development of policies for the Renewable promotion and development of the Power Efficiency and Energies |
SG-SICA |
Institutional Fortification of the Power Sector of the countries of SICA for the development of policies for the Renewable promotion and development of the Power Efficiency and Energies |
(7) Under Execution |
€ 57378.00 |
| 264 |
Regionals |
8.35 |
Guidelines for design & implementation tariffs schemes for electric generation. |
Green Stream |
Guidelines for design & implementation tariffs schemes for electric generation. |
(1) Projects in Formulation |
€ 28000.00 |
| 265 |
Regionals |
8.36 |
Creation of Fund for information system development & maintenance |
UCR |
CCreation of Fund for information system development & maintenance. |
(7) Under Execution |
€ 70000.00 |
| 266 |
Regionals |
8.37 |
Assessing and Harnessing Renewable Resources: Empowering Decision Makers in the Dominican Republic |
Worldwatch Institute |
Assessing and Harnessing Renewable Resources:
Empowering Decision Makers in the Dominican Republic
|
(7) Under Execution |
€ 96767.00 |
| 267 |
Regionals |
8.38 |
Vulnerability of the hydroelectric production systems in Central America to the Climatic Change and its adaptation options |
OLADE |
Vulnerability of the hydroelectric production systems in Central America to the Climatic Change and its adaptation options |
(7) Under Execution |
€ 123076.92 |
| 268 |
Regionals |
8.39 |
Efficient kitchens for the Improvement of the Energy Efficiency and the Reduction of the Impact in the Forest of the Communities Located in the Territorial Unit Transfronteriz; UTT Lenca Located between El Salvador and Honduras |
Asociacion de Cooperacion Rural en Africa y America Latina (ACRA) |
To reduce the consumption of firewood demanded by the settler inhabitants in the Cross-border Unit Territorial between El Salvador and Honduras for the sake of the improvement of calidd of life, the sustainable environmental development, the nourishing and nutritional security, awareness in the use of alternative energies and the promotion of regional integration.
|
(5) Contract in Signature |
€ 52000.00 |
| 269 |
Regionals |
8.40 |
EFFICIENT KITCHENS FOR SCHOLASTIC CENTERS OF THE CROSS-BORDER UNIT, UTT PAZ-CHINAMAS, EL SALVADOR, GUATEMALA AND FAMILIES OF THE COMMUNITIES AROUND THESE SCHOLASTIC CENTERS. |
Asociación Rotaria de Nueva San Salvador. |
To diminish the cutting of trees and to generate a culture of respect to the environment in the childhood of the Scholastic Centers of the populations objective and in its homes
|
(7) Under Execution |
€ 67404.00 |
| 270 |
Regionals |
8.41 |
Promotion of solutions sustainable energetics in the design and implementation Central American slumses |
Secretaría de Integración Social- Consejo Centroamericano de Vivienda y Comisión Centroamericana de Ambiente y Desarrollo |
To technically attend the Central American Council of House and Asentamientos Humanos (CCVAH) in the elaboration and regional promotion of technical lineamientos for the design, construction and location of power sustainable popular house that reduces the vulnerability and foments a more suitable use of the ground incorporating criteria of adaptation and mitigation to the Climatic Change.
|
(7) Under Execution |
€ 115385.00 |
| 271 |
Regionals |
8.42 |
Provision of renewable energy by means of solar energy for exhausted families of the municipality of Nahuaterique in the departments of Morazán (El Salvador) and department of La Paz (Honduras), zone of the handbags. |
Fundacion para el desarrollo de los Juvenil (FDJ) |
To contribute to improve the Environment and the quality of life of people who live in situation of impoverishment to the interior of the municipality of Nahuaterique by means of the installation of systems of solar energy.
|
(6) In transact - DAF |
€ 50000.00 |
| 272 |
Regionals |
8.43 |
Successful projects in Cross-cutting issues to the energy development and environmental sustainability |
Centro Interuniversitario de Investigacion para el Desarrollo Sostenible- "Sapienza" Universidad de Roma |
|
(2) Projects in Revision |
€ 69230.00 |
| 273 |
Regionals |
8.44 |
The Way Forward for Renewable Energy in Central America: Developing Strategies Based on Best Practices? |
Worldwatch Institute |
|
(2) Projects in Revision |
€ 69230.00 |
| 274 |
Dominican Republic |
9.01 |
Biogas and fertilizers production in a pork farm |
COAPI |
To perform a feasibility study for a biogas production facility and its byproducts such as fertilizers |
(8) Finished |
€ 25000.00 |
| 275 |
Dominican Republic |
9.02 |
Biofuels production from Jatropha Curcas |
Biocombustibles S.A.(Bioconsa) |
The project is based in the production of seeds and oily plants wich will be used for oil extraction to produce Biodiesel., the plantation will be located in the Dominican Republic, in the municipality of Hato Mayor del Rey, seccion del Valle, Paraje Los Corozos, about 150 kilometers of the Santo Domingo city.
The property has an altitude of 156 meters on the sea level and the maximum temperatures are 36 degrees and the minimum of 20 degrees, the last 5 years precipitation average is around the 2000 cubical millimeters by squared inch. The selected area has water springs and cisterns that assure water permanently. |
(9) Inactive |
€ 50000.00 |
| 276 |
Dominican Republic |
9.05 |
Jatropha curcas plantations in Dajabon |
Jatropha del Caribe |
To establish jatropha plantations in Dajabon area (RD-Haiti border) |
(8) Finished |
€ 107676.00 |
| 277 |
Dominican Republic |
9.07 |
Water supply using renewables to communities in the H-DR border |
Fundación para el Desarrollo Comunitario Save the Children Dominicana |
To supply water to three communities in the Haitian-DR border, in Dajabón, Montecristi and Santiago Rodríguez using PV systems |
(2) Projects in Revision |
€ 50000.00 |
| 278 |
Dominican Republic |
9.08 |
Assessment of the wind potential in Monte Cristi |
Comisión Nacional de Energía, CNE |
To install 2 wind measurement equipments for assessing the wind potential |
(2) Projects in Revision |
€ 60000.00 |
| 279 |
Dominican Republic |
9.09 |
Feasibility studies for Guzmancitos wind projec |
Poseidón Energía Renovable, C. por A. |
To install 2 wind measurement equipments for assessing the wind potential |
(8) Finished |
€ 60000.00 |
| 280 |
Dominican Republic |
9.14 |
Hydroelectric advantage micro in four isolated rural communities of the Dominican Republic |
Programa de Pequeños Subsidios (PPS-SGP) |
Hydroelectric advantage micro in four isolated rural communities of the Dominican Republic
|
(7) Under Execution |
€ 140000.00 |
| 281 |
Dominican Republic |
9.15 |
EQUIPMENT OF ELECTRICAL SYSTEM AND PUMPING WITH SOLAR ENERGY, CLINICAL RURAL THE PLACE, KILLS PALACE, GREATER CATTLE RANCH, DOMINICAN REPUBLIC |
IDAC Instituto de Accion Comunitaria, Inc |
To equip to the rural clinic with the community the Place with the service of electrical energy and permanent potable water, by means of the installation of a generator ELT to pave.
|
(4) Elaborating contract |
€ 7692.00 |
| 282 |
Dominican Republic |
9.16 |
?TWO EQUIPMENT OF ELECTRICAL SYSTEM AND RURAL PUMPING WITH SOLAR ENERGY, CLINICS THE AVOCADO, NEYBA, BAHORUCO AND THE LANCE, ENRIQUILLO, PROVINCE BARAHONA, DOMINICAN REPUBLIC? |
IDAC Instituto de Accion Comunitaria, Inc |
To equip to the rural clinics with the communities with the Avocado and the Lance with the service of electrical energy and permanent potable water, by means of the installation of a generator ELT to pave
|
(2) Projects in Revision |
€ 19230.00 |
| 283 |
Dominican Republic |
9.17 |
?TWO EQUIPMENT OF ELECTRICAL SYSTEM AND RURAL PUMPING WITH SOLAR ENERGY, CLINICS, SAN FELIPE, PIMENTEL, PROVINCE DUARTE AND THE DAJAO, VILLA THE ALMÁCIGOS, SANTIAGO PROVINCE RODRIGUEZ, DOMINICAN REPUBLIC? |
IDAC Instituto de Accion Comunitaria, Inc |
To equip to the rural clinics with the communities with the Place and the Dajao with the service of electrical energy and permanent potable water, by means of the installation of a generator ELT to pave.
|
(1) Projects in Formulation |
€ 19230.00 |
| 284 |
Dominican Republic |
9.18 |
Rural electrification in the community of the Layer, province Monsignor Nouel, Dominican Republic, by means of installation of communitarian microhydroelectric system |
Federación de Campesinos Hacia el Progreso (FCHP) / Programa de Pequeños Subsidios (PPS-SGP/FMAM) |
?To contribute to the sustainable development in zone of mountain, being guaranteed the access to the service of electricity of 15 families of the community of the Layer (province Monsignor Nouel), by means of the microhydroelectric advantage of a water source in the high river basin of the Yuna River. 6KW "
|
(2) Projects in Revision |
€ 23077.00 |
| 285 |
Dominican Republic |
9.19 |
Energy for sustainable development of Sabana de San Juan |
Fundacion Sur Futuro |
|
(1) Projects in Formulation |
€ 60150.00 |
| 286 |
Dominican Republic |
9.20 |
Study of social and cultural practices in cooking |
Fundacion Sur Futuro |
|
(2) Projects in Revision |
€ 12781.00 |
| 287 |
Dominican Republic |
RD 9.21 |
|
_ |
|
(7) Under Execution |
€ 11538.50 |
| Total: |